Hydrogen & AI data centres
Large loads need their own energy planning.
An electrolyser needs as many operating hours on green power as possible. A data centre needs power without interruption – every second of the day. Both raise new questions for generation, grid connection and metering. That energy side is exactly what we plan.
Green-H₂-Hub Neumünster, in development
Green-DATA + BESS Gotha, in permitting
Green electricity marketed – experience with balancing groups and PPAs
in our own portfolio, in Neumünster and Gotha
Power-to-X
Hydrogen & electrolysis
Whether green hydrogen pays off depends on the power supply: on operating hours, on proof of green origin and on procurement costs. We match PV generation and electrolyser load so that these three factors fit together.
Our part
- Matching generation and load profiles
- Grid-connected, off-grid and partially self-sufficient operating concepts
- Metering concept and accounting for green power supply
- Economics of PV, PPA and grid supply
Not our scope
- Electrolyser plant construction
- Process engineering
- H₂ storage and logistics

Data centres
AI data centres
AI data centres draw large amounts of power, at times with abrupt swings. We plan how this load is supplied reliably and economically – with on-site generation, storage and grid supply, and with a power mix that can be verified as green.
Our part
- High, sometimes dynamic load profiles and load peaks
- Security of supply and redundancy on the energy side
- Load management and storage integration
- Supply mix of PV, grid, PPA and direct supply
Not our scope
- IT and network planning
- Cooling and building services
- Data centre operation

Why this belongs together
We know both sides of the electricity meter.
Our team has been planning solar systems since 2008 and marketing green electricity since 2013. For large consumers, it is exactly this combination that matters.
Generation
How much solar power can be generated on site or nearby – and at which hours?
Grid & market
Which connection is realistic, which PPA structure fits, and how is the balancing group managed?
Load & storage
How is the load curve covered, where does storage help, and what does each megawatt hour cost?
Frequently asked questions
On sector coupling.
Do you also plan the electrolyser or the data centre itself?
At what stage should we involve you?
Do you only work on your own projects?
Planning a large energy consumer?
Send us the capacity, the location and – if available – the expected load curve. We will show you which supply options could pay off.