References

Projects in operation – and projects taking shape.

From a 131 kWp commercial rooftop to a 50 MW hydrogen hub: a selection of projects we have planned, developed and supported.

≈ 2.0MWp

Rooftop capacity across five completed commercial projects

75MW

Sector coupling in development

1,250MW

Solar projects our team has supported since 2008

4

Countries: Germany, Italy, Spain, France

Sector coupling · own portfolio

Our largest projects.

In developmentNeumünsterOwn portfolio

Green-H₂-Hub

The plan is a hydrogen hub that supplies green hydrogen, oxygen and usable waste heat.

Capacity
50 MW
Status
Planning resolution passed
Outputs
H₂, O₂, waste heat

DCE’s contribution: PV design · power supply design · balancing group management

Visualisation of the planned Green-H₂-Hub Neumünster: a ring-shaped building with a solar roof in a green landscape
Visualisation
  1. 26 Mar 2024Planning resolution (Aufstellungsbeschluss)
  2. OngoingLand-use planning & permitting
  3. NextConstruction and commissioning
In permittingGothaOwn portfolio

Green-DATA + BESS

The plan is a data centre with battery storage that runs on green power and puts its waste heat to use.

Capacity
25 MW
Status
Building permit application submitted
Storage
Battery (BESS)

DCE’s contribution: Site acquisition & contracts · authorities & permitting · power supply design · balancing group management

Visualisation of the planned Gotha data centre with battery storage and wind turbines in the background
Visualisation
  1. Aug 2025Building permit application submitted
  2. OngoingPermitting procedure
  3. NextConstruction and commissioning

Rooftop solar parks

Completed commercial rooftops in northern Germany.

Investor models, operator mandates and our own portfolio – usually with PV design, coordination with the grid operator and authorities, and construction supervision.

Aerial view of the Nottensdorf I rooftop system749 kWp

Nottensdorf I

Investor model · full and surplus feed-in · in operation since November 2022

PV designGrid operator & authoritiesConstruction supervisionFinancingMonitoring
Aerial view of the Jork rooftop system553 kWp

Jork

Investor model · in operation since January 2024

PV designGrid operator & authoritiesConstruction supervisionFinancingMonitoring
Aerial view of the Nottensdorf II rooftop system415 kWp

Nottensdorf II

Investor model · full feed-in, PPA with an energy user in progress · in operation since July 2022

PV designPPAConstruction supervisionFinancingMonitoring
Aerial view of the Bimöhlen rooftop system148 kWp

Bimöhlen

Commissioned by the operator · full and surplus feed-in · in operation since June 2023

PV designGrid operator & authoritiesConstruction supervisionMonitoring
Aerial view of the Gönnebek rooftop system131 kWp

Gönnebek

DCE’s own portfolio · in operation since December 2023

PV designGrid operator & authoritiesConstruction supervisionMonitoring

Your project?

Commercial rooftop, ground-mounted site or large consumer: we assess what is possible.

Typical project set-ups

What we usually work on.

Three starting points we often come across – anonymised, with our contribution and what is on the table at the end.

A

Commercial rooftop with self-consumption

Starting point
Production or logistics building with high daytime consumption, in some cases with tenants on site.
Our contribution
Module layout planning, metering concept with cascade metering and separation of third-party volumes, comparison of self-consumption versus feed-in, tender.
Result
Tender-ready documents and a metering concept agreed with the grid operator.

Comparable: Nottensdorf I, Bimöhlen

B

Ground-mounted site in development

Starting point
Owner or developer with a suitable site; grid connection and planning rights still open.
Our contribution
Site screening, grid connection request and grid connection point, coordination with the municipality and land-use planning, revenue model: EEG (German Renewable Energy Sources Act) tender versus PPA.
Result
A sound basis for deciding on site securing and on further development towards ready-to-build status.

Typical time to ready-to-build status: 12–36 months

C

Load profile coupling for H₂ or a data centre

Starting point
Planned large consumer with a constant or strongly fluctuating load curve.
Our contribution
Matching generation and load profiles, supply mix of PV, grid and PPA, storage, metering concept and balancing group.
Result
An energy concept that serves as the basis for plant designers, grid operators and lenders.

Comparable: Neumünster, Gotha